Friday, October 22, 2010

How to get back into the quilting swing of things

I really have been sewing-more than the blog or I recognize. The new school year started about six weeks back, and I knew there would be homework nights with my DD. So I visited my quilting space and located the UFOs I wanted to work on as part of a guild challenge for the next year, through August 2011. Then I figured out the baby steps those projects have that would need smaller time chunks. It helped that I've set up an old DVD player in my sewing space, and I'm working my way through the Harry Potter movies in advance of movie #7 coming out soon.

So here's my progress so far:
  • The kitty in the corner hanging from a previous post: the center is quilted (two 1 hour evenings) and the background around the kitties is quilted (two 1 hour evenings).
  • I have cut and pieced the backgrounds for the Tom's t-shirt quilts-I even have the batting bought. (four 30 minute evenings) Layering comes once I have the kitty cat quilt done. I'll use fusible spray.
  • The paper pieced flowers for the gaggy 30s quilt are done (two Saturday afternoons-including that recent retreat)
  • The black yo-yo flower centers were done (three 30 minute evening sessions)
  • Took a Becky Goldsmith class (spent two days as her hostess and pupil), and finished 3 of the 4 class projects. I'll get the circles done soon.
So in the past 6 weeks, I've worked through 15 separate sewing room visits, not to mention making great strides with an antique needlepoint project I'm determined to have done by next summer's end. I have set aside Sunday afternoon to go sew with buddies, so that will be productive time. If the weather is good, I may take one of those t-shirt quilts outside and do the spray basting. We suspect the spray bothers my DD, even though I don't think the smell is overwhelming. So that is better done outside.


I'll need to get the gaggy 30's quilt back on the wall soon to make sure I'm making that flower section and side panels the correct sizes. I'll take pics and post soon. (Yeah, famous last words!)

Friday, September 10, 2010

Weekend here I come

I've been so tired all week. This is greatly due to the retreat last week, when I delighted in shorting myself on restful sleep so I could sew more. I did get to bed around 11:30 at night, but then chose to read a murder mystery till way too late in the morning. Such a treat, only because I could do this without the guilt of keeping DH awake. Then there was no rest for the weary, since once I was home, DD has needed some support all week in the evening with writing, math, or physics. Often until 11:30. And then up again by 6:30. Yikes, this boils down to no chance of me sewing now for FIVE whole days. This is serious withdrawal after that intensive retreat.

So DD has a cross country meet out of town tomorrow. She is out by 6:30 am. I will see her out the door, and then nap. Yipee!! Maybe I'll have a four hour stretch after said nap where I can make it to the machine and put together the backing for one or two of the Tom's t's quilts. Maybe even get one spray basted.

I put together a rather long UFO list for myself as part of our guild challenge. I would need to quilt a quilt every 6-8 weeks for the next year to do half of what I want to do. I'm going to make a serious effort to see if this is possible.

Tuesday, September 7, 2010

How wonderful it was to retreat!

My guild, the Illini Country Stitchers, held a retreat at the Threads of Time Danville IL retreat center over the 3 day weekend. About fifteen people came, some for all the time, some for just a day. I spent three nights and 2 full days there and got so much done. I thought I packed too ambitiously, with way too many tasks to do, but ended up getting all done to the point I wanted. Today I'm tired, but happy.

Here is the second Tom R. t-shirt quilt, made a bit smaller than twin bed sized. The first one is posted in January 2010. The piecework was done on retreat, but all the t's were precut, stabilized, and had a designated spot mapped out in advance.
 Now my next task is to applique a couple of items to fill dead space in two spots (navy gap on top right and in the blue space below in the bottom angled piece). Then I'm ready to layer and quilt these two puppies. Can they get done by next spring? Depends on how much homework help my high school daughter needs.

Then I owe myself the posting of this little wall hanging, Kitty Corner. I just love the golds it it. The top was finished at the May guild retreat. I'll have to look up the pattern designer later.
That's it for now. I'll get the other September retreat projects out for photos and post them soon.

Monday, July 12, 2010

Great start to July

I love having a small sewing group to keep me on task. While my guild is also great, there is nothing like a set of friends to remind me that I quilt for my peace of mind, and that when I'm not quilting, other parts of my life start wearing on me.

So one friend in my group issued a challenge to look for the reason(s) we felt we weren't making better progress on our quilting projects, and tackle one or more for the next 3 weeks. This in response to many of us saying we hadn't even unpacked our machines or projects between the times we gathered to sew together.

So my response was to challenge myself to three tasks before we leave on a July 25 vacation:

1. Finish machine quilting my Dad's t-shirt quilt (about 25% done) as I’d like to take it to Colorado to bind.

2. Finish scanning my father’s collection of slides and get the indexes for the carousels scanned and labeled. This set of his photos from about 1960-1979 will go on DVDs as gifts to my family, and it’s been hanging over my head now for about 4 years. I’d estimate I’ll have about 800-900 slides scanned when this little project is done. After last night, I have 1 more carousel to do; about 90 slides.

3. Make my basement feel like it’s a living space, and not a storage space. This is probably my biggest obstacle to sewing, as I hate facing the junk on my way to my sewing area. To this end, I spent most of the weekend working on this. DH and I bought big storage cabinets with doors and they’ve been filled with the excess household and keepsake items. I’ve tossed another 3 trash bags of stuff, and reorganized all the books, scrapbooks, gift wrap, and my family photo albums and books we love to read and reread onto dedicated book shelves. I’ve freed up two plastic shelves that are going into the furnace room, and they’ll help me when it’s time for that annual space cleaning. I need to move a 4 drawer file cabinet across the room, and then I can consolidate all the paperwork that I think I need to keep in one space. I mostly cleared off my cutting table. I’ll continue to putter in the basement in the evenings, with my goal of having the cleaning done by next Sunday.

I'll take some photos of the spaces and post them soon.

Tuesday, June 29, 2010

Great end to June

Nothing ends a month on a better note for me than to spend the last weekend getting some serious sewing done. So I got about 8 hours in on Saturday with my small quilt group at my house, and then another 3 hours in on Sunday with the same group at a fabric store meeting room. I chose to devote my time on 2 relatively new projects. Neither got done, but both moved along considerably. Photos still to come.

Then my DD gave me the push to clear out a bunch of clutter in the basement that is now in my van, ready for a charity drop off. This gives me a much better first impression when going down there to reach the sewing area. I decided I need to get back to the quilting on my t-shirt quilt. I need those quilting pins for other projects. Friend Dorothy is empowering me to get my quilting butt in gear and layer and quilt some of the backlog of tops I have. Can it really be as easy as she makes it sound?

Tuesday, June 22, 2010

Oh, June is almost gone too!

And still no photos posted. I looked at my April project list, and only a couple have been touched. My guild had their big retreat in May, and I got away for 3 nights/3 days. I got Mitchell's cat ironed down, and that was enough. I took some cheap batik jelly rolls and got those strip pieced for an impromptu quilt. It still needs black strips between the 8" panels. I also put the components together for the wall quilt that had the cute striped cats in the corners, but left it as a top.

I did get that Project Linus quilt bound. I have bought the materials I need for the outline stitched cat blocks, and transferred the patterns to the muslin.

So I invited my small group to come over this Saturday, as my incentive for some housecleaning, and to restart some of these projects. I'll also help Amanda take a small horse wall hanging to the next level, with her getting the fusible on the fabric, and the pieces to a foundation for fusing.

Plus we have a Sunday afternoon booked for sewing at a local fabric store. So for Saturday, my focus will be on
1. stripping the batik panels, and maybe fusing the applique details so that top is done;
2. layering the kitty in the corner wall hanging for quilting (on Sunday?);
3. quilting a few blocks on the t-shirt quilt (need those pins for #2;
4. work with Amanda here and there

If there is additional time, I'll make myself quilt a few more t-shirt blocks.

Monday, April 26, 2010

Can April 2010 really be coming to an end?

It's mid spring around here. Where did January through March go? I had 3 hours of time spent on Mitchel's Cat yesterday-I have 2 more colors to get cut out and put on the collage-like foundation. Then I need to do my trimming so I have the right edges on top. Soon I'll be pressing it all down. I need this to be stuck together before I go on retreat May 13 as I don't want to possibly get another person's iron all sticky, but can't use a personal iron there (we start blowing fuses). This I will definitely show here when the pressing is done.

Retreat projects I propose to do so far include (which may change):
1. quilting my Dad's t-shirt quilt
2. stitching down Mitchel's cat quilt edges-maybe layering and quilting this too
3. creating gaggy 30's paper pieced flowers for below the window
4. binding a Linus quilt
5. something with jelly roll strips from the Chicago show
6. preparing the blocks for that cat pattern with the design done in outline stiches